|
See side bar below for comprehensive FAQs |
|

Customer Projects |
Listing Customer Projects 26 to 30 of 30 |
|
|
|
|

|
An extension to a stainless steel plant of Carinox with a new building for the production of inox. The steel plant has a production capacity of 10.000 tonnes a year. The total surface area of the plant is 23.000 m², with a maximum height is 53 m. |
|
|
|
|

|
A maintenance workshop for different types of airplanes. In order to be capable of storing large aircrafts, huge column-free dimensions were required with 2 main spans of 95 metres and a depth of 59 metres. A considerable number of cranes are integrated into the roof structure along with other technical equipment. |
|
|
|
 |
Dynamic recalculation of roof structure to allow for increasing temporary loads and two planned towers, of about twice the height of the stadium itself, which will influence the wind loads. |
|
|
|
 |
A very effective program for the calculation of internal forces calculation was required for this office block. It had to be able to prepare the structural model and to offer various options to check the results within one application. SMART Modeller EPW fulfilled these requirements. |
|
|
|
|

|
An aboveground welded thermoplastic scrubber had to be built in a draining piping system for gas waste products from a technological process. The vessel is equipped with a nozzle system for spraying liquid in the washing process for waste gas. |
|
|
|