CADS RC Details Dubai Creek

 30 Jul 2006

CADS is proud to have been involved in the reinforcement detailing for the waterfront component on the Dubai Creek. CADS onsite coordination team has worked closely with the architect Mazaraki-FBK Design consortium, designers Meinhardt Consulting Engineers' Singapore office and the main contractor Al Futtaim Carillion to provide shop drawings and bar bending schedules.

The ambitious construction schedule required more than 1000 drawings to be detailed, and in excess of 20,000 tons of rebar to be placed in just nine months! The CADS teams detailed and scheduled the entire Harbour Plaza Hotel, a 2km Road Tunnel, Crowne Plaza Hotel, and a major parking facility.

Dubai Festival City Model
HOME
ABOUT US
SOLUTIONS
PRODUCTS
NEWS
PROJECTS
TRAINING
CONTACT

With over 4000 customers it is no surprise that CADS supplied software has made a major contribution to the built environment.  Here are just a few of the projects that our customers and strategic partners have kindly supplied to help illustrate what can be achieved.

Downloads


Cyprus Airports Testimonial (832 Kb)
Al-Futtaim Carillion Testimonial (2658 Kb)
Meinhardt Testimionial (365 Kb)
UK - Swimming & Diving Centre - Basement Walls (360 Kb)
UK - Stairs (244 Kb)
UK - Sports Hall (279 Kb)
UK - Residential - Multi-storey - Core Starters (351 Kb)
UK - Residential - Beams (438 Kb)
UK  - Hospital 2 (535 Kb)
UK - Hospital (744 Kb)
UK - Ground Slab (494 Kb)
UK - Factory Ducting Pits (509 Kb)
Beam Elevation Drawing (428 Kb)
Core Walls Drawing (811 Kb)
Flat Slab Drawing (589 Kb)
Ground Floor Drawing (1018 Kb)
Retaining Wall Drawing (649 Kb)
Steel Reinforcement Drawing (702 Kb)

 

www.intergage.co.uk