CADS RC Details Dubai Creek

 30th Jul 2006

CADS is proud to have been involved in the reinforcement detailing for the waterfront component on the Dubai Creek. CADS onsite coordination team has worked closely with the architect Mazaraki-FBK Design consortium, designers Meinhardt Consulting Engineers' Singapore office and the main contractor Al Futtaim Carillion to provide shop drawings and bar bending schedules.

The ambitious construction schedule required more than 1000 drawings to be detailed, and in excess of 20,000 tons of rebar to be placed in just nine months! The CADS teams detailed and scheduled the entire Harbour Plaza Hotel, a 2km Road Tunnel, Crowne Plaza Hotel, and a major parking facility.

Dubai Festival City Model
HOME
ABOUT US
SOLUTIONS
PRODUCTS
NEWS
PROJECTS
ACADEMICS
CONTACT

With over 4000 customers it is no surprise that CADS supplied software  and detailing service has made a major contribution to the built environment.  Here are just a few of the projects that our customers and strategic partners have kindly supplied to help illustrate what can be achieved.

 

Drawings & Documents


CADS RC Detailing Brochure (8080 Kb)
Cyprus Airports Testimonial (832 Kb)
Al-Futtaim Carillion Testimonial (33 Kb)
Meinhardt Testimonial (365 Kb)
Al Raha Beach Basement Slab Bottom Mat Drawing Sample (1464 Kb)
Al Khail Road Bridge Sample Drawing (628 Kb)
Dubai Festival City Core Walls Sample Drawing (1159 Kb)
Meena Plaza Core Wall Sample Drawing (450 Kb)
Sewage Treatment Plant Sample Drawing (592 Kb)
F1 Coaster Column Basement Sample Drawing (381 Kb)

 

 

"CADS had established an excellent reputation for meeting tough project deadlines without compromising on presentation or accuracy! CADS are able to mobilise a large detailing team at short notice and use their market leading software product CADS RC to great effect; their drawings are some of the best I have ever seen"

Andrew Piechowiak - AFC Principle Design Manager

www.intergage.co.uk