On customers' demand, a "differential" settlement of the column bases was taken into account. The wind loads have been determined taking into account the different positions of the wheeled door panels. All load cases were combined according to the combination rules described in CM66 (French standard), which resulted in approximately 60.000 load combinations. Verifying and optimising all bars for all 60.000 combinations is a very time-consuming job. This problem was resolved by storing only "the envelope internal forces". This action resulted in a "workable" amount of results, which empowered us to recalculate and optimise the project within a reasonable time period.
While creating calculation notes we encountered another problem. For this project it is quite easy to create a vast amount of paper output with input data and results. Although this would have been the easiest for us to do, we decided to hand over a demo-version of ESA-Prima Win to the controlling parties as well as a project file which included the calculated results. By consequence, the input data and the results were much more synoptic to them.
Project Characteristics 2100 ton 26000 m² Chantier Air France 31700 Blagnac-Toulouse |