This SMART Scaffolder v1.01 includes many significant fixes and improvements.
Enhancements:
- The software can now be run for a 30-day trial period without the need to use a hardware key (dongle). When the software is used in this mode it is fully functional but only the 'independent' scaffold type can be used
- It is now possible to enter a lift height of up to 3m for an independent - a warning is displayed rather than an error
- The limits for tower dimensions have been increased to 2.5x2.5m
- The 'Enter estimate data' screen, management report, and internal estimate report now indicate whether estimate-specific rates have been used
- Several usability enhancements have been made, including: 'OK' buttons have been added to each of the pop-up screens, 'pop up' buttons in grids are always displayed for clarity, and it is now possible to drag the mouse while drawing a plan view
- The software now ships with a default set of rates
- The elevations to which add-ons will be applied can be selected graphically where a plan view has been drawn
- Galvanised tubes are now used by default rather than steel tubes to comply with TG20
- Some improvements have been made to the CASE address book import
Corrections made:
- The software can now support high DPI laptop displays
- The full and summary quotations now clearly indicate items where multiple quantities will be supplied
- The circular tank price calculation has been corrected.
|